Friday 27 July 2012







We started of prepering the field by harrowing the soil. Afterwards, we measured out where we would drill holes for our plants and poles. We have a distance of 1m. between the plants and  1,4m. between the rows.

These are pictures of the first day of drilling for the poles. It was the 25th of May 2012 and it was about 30 degrees celcius. A hard day of work for two people.